Sign up to receive a text message or email when new bids are added!
Bid Title: SCADA/Control System Upgrade
Category: Bid Opportunities
Status: Closed

Description:

SCADA/CONTROL SYSTEM UPGRADE

Sealed Bids will be received by the Department of Utilities of the City of Fremont, Nebraska at the office of the City Clerk, 400 East Military Avenue, Fremont, Nebraska, until 2:30 PM CDT, on Tuesday, May 1, 2018, for the purchase of the following:

The Work includes furnishing all material, labor and equipment to upgrade the City's existing SCADA/Control System for their existing facilities.


Bids received after the above specified time for opening will be returned unopened to the sender.

Plans and Specifications are available by request at the office of the Electrical Engineering, 3000 East 1st Street, Fremont, Nebraska, 68025 (Phone 402-727-2613).

Each proposal shall be sealed in an envelope marked: "SCADA/CONTROL SYSTEM UPGRADE"

A pre-bid conference will be held at 9:00am April 3, 2018 at the City of Fremont Municipal Building, Second Floor. Attendance is strongly encouraged. Please reference Instructions to Bidders for details.


Each bidder shall submit with each proposal a certified check or bid bond by a nationally recognized company, countersigned by a resident agent, payable to the City Treasurer of the City of Fremont, Nebraska, the amount of which shall be not less than five percent (5%) of the bid price and which shall guarantee good faith on the part of the bidder and the entering into Contract within 15 days after notification of acceptance at the price bid.

A performance bond in the amount of 100 % of the Contract price will be required of the successful bidder at the time of execution of Contract.


Bids will be evaluated by the City as outlined in the Instructions to Bidders section of the bid documents.  The City reserves the right to select the bid which best suits its needs whether price is the lowest or not, and also reserves the right to reject any or all bids and waive irregularities therein, and all bidders must agree that such rejection shall be without liability on the part of the City for any penalty brought by any bidder because of such rejections; and the filing of any bid in response to this invitation shall constitute an agreement of the bidder to these conditions.

Bidders may not withdraw bids for a period of sixty (60) days after the date of the bid opening.

City of Fremont, Nebraska
Scott Getzschman, Mayor


Attest:

Tyler Ficken City Clerk


Publication Date/Time:
3/17/2018 6:00 AM
Closing Date/Time:
5/29/2018 2:30 PM
Related Documents:
City of Fremont NE SCADA Control Systems Upgrade Contract Documents - April 2018
City of Fremont Wellfield Manual
Electric Scada Operators Manual - entire
Example Water Sys Monthly Daily Report
Existing power plant network diagram
FDU SCADA MAP 12132017a
Fremont Water SCADA-control system inspection results (2)
Gas SCADA Custom Reports
Gas SCADA System Overview
NMR-FIBERRINGSCADAMAP-2016 Model (1)
Operation Maint Manual - Water System Improvements (VOL 1 of 2)
Operation Maint Manual - Water System Improvements (VOL 2 of 2)
Scada Sub A Encls Model (1)
Scada Sub A Pnl B Model (1)
Scada Sub A Pnl C Model (1)
Scada Sub A RadioEncl Model (1)
Scada Sub B PLC Model (1)
Scada Sub B Pnl A Model (1)
Scada Sub B Pnl B Model (1)
Scada Sub B Pnl Layout Model (1)
Scada Sub C Conn Model (1)
Scada Sub C Layout Model (1)
Scada Sub C PLC Model (2)
Scada Sub D ContRelay Model (1)
Scada Sub D PLC Model (1)
Scada Sub D Pnl A Model (1)
Scada Sub D Pnl B Model (1)
Scada Sub E ContRelay Model (1)
Scada Sub E PLC Model (1)
Scada Sub E Pnl A Model (1)
Scada Sub E Pnl B Model (1)
Scada Sub E Pnl Layout Model (1)
Scada Sub F PLC Model (1)
Scada Sub F Pnl B Model (1)
Scada Sub G Comm Model (1)
Scada Sub G CommCable Model (1)
Scada Sub G Orion Model (1)
Scada Sub G PLC Model (1)
Scada Sub G Relay Model (1)
Scada Sub G RTU Model (1)
Scada Sub G TermConn Model (1)
Scada Sub G TermConn2 Model (1)
Water System Improvements O M Manual
Well Field Chem Bldg RTU Water Transmiss Upgrade 2008
Addendum 1 - SCADA Control System Upgrade - 03232018
SCADA Prebid Attendance List
Addendum 2 SCADA Control System Upgrade 04132018
Addendum 3 SCADA Control System Upgrade 04202018
Addendum 4 SCADA Control System Upgrade 05012018
Addendum 5 SCADA Control System Upgrade 05092018

Return To Main Bid Postings Page